


As part of a construction team, Bosman Watermanagement took care of the entire process for the new plate aerator installation at the Echten wastewater treatment plant. This included the design, delivery, installation, and successful commissioning of the system, consisting of two circulation systems and a BCFS reactor.
The aim of the project was to increase the aeration capacity and make it more sustainable. In the two recirculation systems, the existing point aerators were replaced by modern fine bubble aeration, which ensures more efficient oxygen transfer and lower energy consumption.


As part of a construction team, Bosman Watermanagement took care of the entire process for the new plate aerator installation at the Echten wastewater treatment plant. This included the design, delivery, installation, and successful commissioning of the system, consisting of two circulation systems and a BCFS reactor.
The aim of the project was to increase the aeration capacity and make it more sustainable. In the two recirculation systems, the existing point aerators were replaced by modern fine bubble aeration, which ensures more efficient oxygen transfer and lower energy consumption.



We’d love to hear your challenge about watermanagement and help you guiding to the right solution.
Doing already better with clients such as



