Used product

BCK pump

Used product

BCK pump

New pump installation for improved water drainage

Commissioned by the municipality of Vijfheerenlanden, De Kuiper Infrabouw recently renovated the pumping station in Hei- en Boeicop. Bosman Watermanagement replaced the existing BC-2V pump.

Increased capacity thanks to BCK 2.2.2

A new BCK 2.2.2 has been installed in place of the old pump. This upgrade has increased the pump capacity to 3.75 m³ per minute, ensuring more reliable and future-proof water drainage in the area.

Pleasant collaboration

We look back on a pleasant and successful collaboration with both De Kuiper Infrabouw and the municipality of Vijfheerenlanden.

Capacity increase

The new pump ensures that more m3 per minute can be pumped.
BCK 2.2.2
The BCK pump is a reliable pump for pumping water from small polders or sports fields.

New pump installation for improved water drainage

Commissioned by the municipality of Vijfheerenlanden, De Kuiper Infrabouw recently renovated the pumping station in Hei- en Boeicop. Bosman Watermanagement replaced the existing BC-2V pump.

Increased capacity thanks to BCK 2.2.2

A new BCK 2.2.2 has been installed in place of the old pump. This upgrade has increased the pump capacity to 3.75 m³ per minute, ensuring more reliable and future-proof water drainage in the area.

Pleasant collaboration

We look back on a pleasant and successful collaboration with both De Kuiper Infrabouw and the municipality of Vijfheerenlanden.

Other projects

Some recent projects our team loved working on: 

Ask us.

We’d love to hear your challenge about watermanagement and help you guiding to the right pumpinstallation
Ask us for advice
Convinced and experiencing the same struggles? Let us guide you.
Doing already better with clients such as

Ask us

We’d love to hear your challenge about watermanagement and help you guiding to the right solution.

Ask us for advice
Hard to find the right product? Let us guide you with some personal advice.

Doing already better with clients such as