Baarland Pumping Station

Bosman Watermanagement was responsible for the engineering, production, and installation of a Vision MC pump and associated discharge pipeline at pumping station Baarland.
Read more
Used product

Vision MC pump

Used product

Vision MC pump

Good water management in Zeeland

Pumping Station Baarland was developed to carefully regulate the water level in the surrounding area, thereby contributing to a safe and reliable water management system. Commissioned by Scheldestromen Water Authority, Bosman Watermanagement was responsible for the engineering, supply, and installation of the pumping station.

The selection of the Vision MC

For this project, a Vision MC configuration was selected, allowing the new pump to be easily integrated into the existing pumping station. The installed Vision 60MC pump has a higher capacity than the previous installation, preparing the pumping station to handle and discharge larger volumes of water than before.

Future-proof water management

In addition to supplying and installing the pump, Bosman Watermanagement also realized the connection of the discharge pipeline to the existing concrete culvert and installed a non-return valve. With this complete and high-quality installation, Pumping Station Baarland continues to operate optimally and is fully prepared for the future.

Engineering

Bosman’s mechanical engineers developed the pump and discharge pipeline with a high level of expertise and dedication.
Fish-friendliness
The installation of a Vision MC enables fish to pass through the pumping station safely and without injury.

Good water management in Zeeland

Pumping Station Baarland was developed to carefully regulate the water level in the surrounding area, thereby contributing to a safe and reliable water management system. Commissioned by Scheldestromen Water Authority, Bosman Watermanagement was responsible for the engineering, supply, and installation of the pumping station.

The selection of the Vision MC

For this project, a Vision MC configuration was selected, allowing the new pump to be easily integrated into the existing pumping station. The installed Vision 60MC pump has a higher capacity than the previous installation, preparing the pumping station to handle and discharge larger volumes of water than before.

Future-proof water management

In addition to supplying and installing the pump, Bosman Watermanagement also realized the connection of the discharge pipeline to the existing concrete culvert and installed a non-return valve. With this complete and high-quality installation, Pumping Station Baarland continues to operate optimally and is fully prepared for the future.

Other projects

Some recent projects our team loved working on: 

Ask us.

We’d love to hear your challenge about watermanagement and help you guiding to the right pumpinstallation
Ask us for advice
Convinced and experiencing the same struggles? Let us guide you.
Doing already better with clients such as

Ask us

We’d love to hear your challenge about watermanagement and help you guiding to the right solution.

Ask us for advice
Hard to find the right product? Let us guide you with some personal advice.

Doing already better with clients such as